The following applies to Residential One and Two Family structures:
Building Permits (These amounts are permit determinates based on square footage and State regulated prices)
|
|
Electrical Permits |
|
| 0 |
- 4,000 |
$51.50 |
Single Inspection Fee |
$70.00 |
| 4,000 |
- 7,000 |
$77.25 |
Service Upgrade |
$70.00 |
| 7,000 |
- and over* |
$77.25 |
Addition/Remodel |
$110.00 |
| *Add $10.00 for each 1,000 over 7,000 |
Addition/Remodel Upgrade |
$170.00 |
| New Construction |
$215.00 |
| |
|
|
|
|
| Mechanical Permits |
|
Plumbing Permits |
|
| Single Inspection Fee |
$70.00 |
Single Inspection Fee |
$70.00 |
| Addition/Remodel |
$125.00 |
Addition/Remodel |
$125.00 |
| New Construction |
$160.00 |
New Construction/Underground |
$160.00 |
| |
|
|
|
| Demolition |
$45.00 / ocurrence |
|
| Re-inspection |
$45.00 / inspection or $45.00 / hour, whichever is greater |
| Special Services |
$45.00 / hour |
|
|
| |
|
|
|
|
| *An Investigation Fee of $45.00 will be charged for work started without a permit. |
COMMERCIAL FEE SCHEDULE
FOR COMMERCIAL TRADE PERMITS
*Plan review and administrative fee $110.00
All required and final inspections
*ELECTRICAL
Services: Thru 200 amps $ 11.55
200 amps thru 600 amps $ 17.33
600 amps thru 800 amps $ 23.10
800 amps and over $ 28.88
Circuits $ 3.47 @
Lighting Fixtures – per 25 and fraction of $ 6.93 @
Dishwasher, Garbage Disposal and Range Hood $ 4.62 @
Furnace – Unit Heater $ 5.78 @
Electrical Heating Units (baseboard) $ 4.62 @
Power Outlets (including ranges, dryers, etc.) $ 8.09 @
Signs – per circuit $ 5.78 @
Feeders $ 5.00 @
Mobile Home Park Sites $ 6.93 @
Recreation Vehicle Sites $ 4.62 @
KVA/HP – each unit up to 20 KVA/HP $ 6.93
20 to 50 KVA/HP $ 11.55
51 KVA/HP and over $ 13.86
Fire Alarm – up to 10 stations and horns $ 57.75
11 to 20 stations and horns $ 115.50
over 21 stations and horns $ 5.78 @
*MECHANICAL
Gas/Oil Burning Equipment-new and/or conversion units $ 28.88@
Chimney, Factory built (Class A) $ 28.88@
Duct System/Hydronic Piping $ 23.31@
Solar Equipment System and Piping System $ 17.33
Gas piping (new install) $ 5.78
Exhaust fan/power exhaust $ 5.78
Flue damper/vent damper $ 5.78
LPG & fuel oil tanks, piping fee included $ 17.33
Central air conditioning and heat pump $ 17.33
*PLUMBING
Plan review and Administrative base fee $ 55.00
All required and final inspection $ 55.00
Fixtures, water connected appliances, floor drains
Special drains, mobile home unit site $ 3.47@
Stacks (soil, waste, vent, conductor) $ 3.47@
Sewers (sanitary, storm and combined) $ 5.78@
Water Service $ 5.78@
Connection building drain/building sewer $ 5.78@
Sub-soil Drains $ 5.78@
Water distributing pipe system, less than 1 inch $ 11.55@
Water distributing pipe system, 1 inch or greater $ 23.10@
Pressure zone backflow preventer $ 5.78@
|